{"id":3334,"date":"2023-08-31T16:32:16","date_gmt":"2023-08-31T16:32:16","guid":{"rendered":"https:\/\/plantconstruction.com\/?p=3334"},"modified":"2023-12-05T00:20:58","modified_gmt":"2023-12-05T00:20:58","slug":"project-award-uc-berkeley-heathcock-hall","status":"publish","type":"post","link":"https:\/\/plantconstruction.com\/news\/project-award-uc-berkeley-heathcock-hall\/","title":{"rendered":"Project Award: UC Berkeley Heathcock Hall"},"content":{"rendered":"\n

<\/p>\n\n\n\n

\"\"<\/a><\/figure>\n\n\n\n

<\/p>\n\n\n\n

Plant is performing new construction of a mixed-use building containing state-of-the-art research and laboratory space, support offices, and classrooms for the UC Berkeley College of Chemistry. The six-story (with partial basement interconnecting adjacent buildings) structure will create a focused arrangement of spaces that connect science and learning around three primary program elements: laboratories, write-up spaces, and grouped amenity spaces such as conference and break rooms. Laboratory functions will consist of physical and synthetic chemistry, chemical and biomolecular engineering, and some general purpose spaces.<\/p>\n\n\n\n

Additional work includes demolition of a current on-site structure as well as on-site elements such as a retaining wall and pedestrian egress bridge; a new exterior generator yard with storage tank; the relocation of an underground fresh air shaft; construction of a new terraced landscape; and relocation of existing underground utilities, all on a busy intersection of the active campus. Designed by renowned architect HOK, the project is being built to achieve LEED Gold certification.<\/p>\n\n\n\n

Plant has completed over a dozen projects on campus, including several ongoing projects such as the Academic Seismic Replacement Building<\/a> and Dwinelle Hall Annex<\/a>. Work is set to start in Q1 of 2024.<\/p>\n","protected":false},"excerpt":{"rendered":"

Plant is performing new construction of a mixed-use building containing state-of-the-art research and laboratory space, support offices, and classrooms for the UC Berkeley College of Chemistry. The six-story (with partial basement interconnecting adjacent buildings) structure will create a focused arrangement of spaces that connect science and learning around three primary program elements: laboratories, write-up spaces, […]<\/p>\n","protected":false},"author":12,"featured_media":3335,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_mi_skip_tracking":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-3334","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/posts\/3334"}],"collection":[{"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/comments?post=3334"}],"version-history":[{"count":0,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/posts\/3334\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/media\/3335"}],"wp:attachment":[{"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/media?parent=3334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/categories?post=3334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plantconstruction.com\/wp-json\/wp\/v2\/tags?post=3334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}